Noise on 5th floor of Library (June 15-19th)

Starting on Monday, June 15th, Ryerson Facilities Management will be coordinating the removal and disposal of ballast from a small roof on the Podium Building.  The ballast that is removed will be transported from the Podium to the Library’s freight elevator, via the north side of the Library’s 5th floor.  The removal of this material will take up to days.  Work will be concentrated during the afternoon and evenings.

Leave a Comment

Your email address will not be published. Required fields are marked *

*