Carrel Moves and New Shelving

Please be advised that during the week of August 22, study carrels will be relocated from the 9th floor to the 6th floor, and new shelving will be installed on the 9th floor.  The majority of this work should take place on Wednesday August 24th and Thursday, August 25.  The work associated with these activities will generate noise, so please relocate to other study space in the Library during this period, or use the 8 floors of study space available in the Student Learning Centre, accessible through a connection on the main floor of the Library.  We apologize for any inconvenience.

 

Leave a Comment

Your email address will not be published. Required fields are marked *

*